Loading...
Loading...
IDPA upgrade hangs at 60% on vCenter Server Appliance (vCSA) and 25% for Appliance Configuration Manager (ACM): Figure 1. ACM Upgrade Percentage Figure 2. vCSA Upgrade Percentage Checking the vcsa_logs.log in the ACM patch directory, the following appears and there will be no other lines after the last one in this output: 29/10/26 19:26:38 run_cmd_vcsa() [2026-10-29 19:26:39,476] : Installation completed successfully. 29/10/26 19:26:38 run_cmd_vcsa() [2026-10-29 19:26:39,476] : Installation process completed successfully. 29/10/26 19:26:38 run_local_command() Executing command: SESSION=$(curl -sk -u 'administrator@vsphere.local:********' -X POST 'https://XX.XX.XX.XX/api/session' -H 'Content-Type: application/json' | tr -d '"') && curl -sk -w "\n%{http_code}" -H "vmware-api-session-id: $SESSION" -H 'Content-Type: application/json' -X POST 'https://XX.XX.XX.XX/api/appliance/shutdown?action=reboot' -d '{"reason":"full_patch_update","delay":0}' 29/10/26 19:26:39 reboot() Reboot initiated via REST API (HTTP 204) 29/10/26 19:29:39 wait_for_vcsa() Checking VCSA is back with target version. Retry count: 1 Note: vCenter IP has been replaced with XX.XX.XX.XX in this output.
The SSH connection from ACM to vCSA is hanging. This connection has no timeout, so if it gets called and the vCSA reboots then this connection is left hanging and never closes. The upgrade waits on that check to close to continue.
UPGRADE CHECK: Log into the vCenter and check that the upgrade has completed. On the vCenter cli run the following command and make sure it shows build 7.0.3.02600-25606036: version.get The following is the expected output if the upgrade is complet: Version: Version: 7.0.3.02600 Product: VMware vCenter Server Build: 25606036 <------------------------------------------------------------------------------------------- Type: vCenter Server with an embedded Platform Services Controller Summary: Patch for VMware vCenter Server 7.0 If this is not the version showing, open a support request with Dell on this issue. If this is the version showing then follow the below steps to work around this issue. WORKAROUND: Run the following command on the ACM to find the hung SSH session: ps -ef | grep 'ssh.*version\.get' In the output of the above command find the leftover SSH to VCSA. The line root@IP version.get is the process to be stopped: root 28090 24128 0 Oct29 pts/3 00:00:00 /usr/bin/ssh -o NumberOfPasswordPrompts=1 -o UserKnownHostsFile=/dev/null -o StrictHostKeyChecking=no root@XX.XX.XX.XX version.getNote the vCenter IP has been replaced in this output with XX.XX.XX.XX Stop the above process, with the following command: kill -9 <PID>In the above output the PID is 28090, so the command will be as follows.kill -9 28090 The upgrade should continue once this process is stopped. If the upgrade does not continue, open a Service Request with Dell support to resolve this issue.
Click on a version to see all relevant bugs