Loading...
Loading...
During the second step of ISSU one-shot process, MEC (Multi-chassis Ether-Channel members may not programmed into standby switch causing MAC flap between the port-channel and the physical interface associated to the same logical port channel.
Seen on specifically on Cat9500-24q and Cat9500-12Q switches in Stackwise Virtual (SVL) that are using ISSU to upgrade from a 16.9.x to a 16.12.x or later release that have port-channel members active and connected to both switches in SVL
While instability will be seen in the port-channels, it is expected that they will recover back to normal operation once the ISSU is complete and both switches are fully migrated to the target version of software in stage 3.
This issue is the result of internal interface numbering changes that take place in order to support breakout cables in later releases (note - You dont need breakout cables to hit this issue, any port-channel member can see it). As a result of this internal change, it is not possible to prevent this instability or provide any software that contains a preventative fix. So, while ISSU between some 16.9.x and 16.12.x releases is fully supported, it will also be expected that this port-channel member instability will also be seen. This defect will not be fixed in any future releases of software and is specific to ISSU between 16.9.x and 16.12 and later releases only.
Click on a version to see all relevant bugs
Cisco Integration
Learn more about where this data comes from
BugZero Plan
Streamline upgrades with automated vendor bug scrubs
BugZero Prevent
Wish you caught this bug sooner? Get proactive today.