Loading...
Loading...
Upgrading from 11.3 or 11.4 fails if the config has a DOS application profile with a "Prevention Duration" value higher than 3600 or lower than 4.
Upgrade fails. 010715d5:3: The escalation period in TPS-based anomaly is out of range [1..3600]. Unexpected Error: Loading configuration process failed.
Upgrading to 11.5.0 through 11.6.1 from 11.3.x or 11.4.x Configuration before the upgrade had a DOS profile with application enabled and "Prevention Duration" value set to a value higher than 3600 or lower than 4.
Set the max-prevention-duration value to the default value of "unlimited" before the upgrade, or within the UCS before installing it (by editing the bigip.conf file within the UCS tarball).
Upgrading from 11.3/11.4 no longer fails when the config had a DOS application profile with "Prevention Duration" value set to a value higher than 3600 or lower than 4.
Click on a version to see all relevant bugs
F5 Integration
Learn more about where this data comes from
BugZero Plan
Streamline upgrades with automated vendor bug scrubs
BugZero Prevent
Wish you caught this bug sooner? Get proactive today.